US Army Accelerates Launched Effects Deployment Under Drone Dominance
The US Army has fielded Launched Effects systems to 11 of its 12 headquarters divisions and all multi-domain task forces.

The US Army has delivered Launched Effects systems to 11 of its 12 headquarters divisions and all multi-domain task forces. Deliveries to the final division are planned to begin next month, accelerating the timeline set by Defense Secretary Pete Hegseth's 2025 Drone Dominance memorandum, which called for full fielding by the end of 2026. The first batch of aircraft from primary contractor Griffon Aerospace arrived about three weeks after the Army identified the need for increased deliveries.
Griffon Aerospace Leads System Delivery
Griffon Aerospace is supplying the majority of the Launched Effects systems. The company has the capacity to deliver hundreds of these systems to the Army each month. Deliveries have included platforms from the company's broader product line, such as the Outlaw unmanned aircraft. Griffon Aerospace President Jordan French did not name all the specific platforms received by the Army, and the total number of systems delivered has not been disclosed.
Operational Capabilities and Flexibility
Launched effects are unmanned aircraft or payloads that can be deployed from crewed aircraft, ground vehicles, or maritime platforms. They provide both kinetic and non-kinetic capabilities, expanding a unit's reach for intelligence, surveillance, reconnaissance, electronic warfare, and strike missions without directly exposing personnel to danger. The Army is procuring various payloads for these roles. A key feature is the ability to reconfigure the payload almost in real time to meet a specific unit's needs. Most of the delivered systems so far have been long-range capabilities provided by Griffon Aerospace.
Acquisition and Training Challenges
The Army is using Other Transaction Authorities (OTAs) as its primary contract vehicle for this rapid acquisition push. Ski Horrocks highlighted the importance of these tools, stating, "The real magic behind the marketplace is all the rapid acquisition authorities and the contract vehicles." Despite the swift delivery pace, which averaged about three weeks from need identification to first delivery for Griffon systems, the Army currently lacks sufficient trained personnel to operate all the systems being fielded. In a related effort, the Army also plans to provide each squad with small, one-way attack drones by the end of fiscal 2026. The names of the divisions that have already received the Launched Effects systems remain undisclosed.
The final step in this initial fielding phase will see the 12th headquarters division begin receiving its systems next month.





